District of Stewart Lift Station Installation

In Spring 2018 we completed a 75hp effluent lift pump installation in the District of Stewart. We utilized our confined space expertise and procedures throughout the work. We isolated 2 other adjacent chambers each day with sandbags to ensure residents were still able to use their wastewater services without interruption. The work included the installation of a new concrete base in the existing chamber, all required piping, pipe restraints, base and lift out assembly installation, pump install, grouting and commissioning. We worked closely with WorkSafe BC for our alternate measures and fully confined space compliance.