Smithers Main Street Watermain Replacement

This project entailed the replacement of 80m of 150mm water main including all necessary service connections. The job site was in a back alley with not a lot of available working room. It required precision and in-depth planning, including multiple pole holds, asphalt replacement, digging alongside a gas line the entire length, as well as working together with the surrounding residents to ensure they had access to their home water systems throughout the project.